Sunday, February 26, 2012

The Base stage 1

The base is to be suspended on concrete slabs.  The frame will be made by 100mm x 47mm timbers.  The outer edge of the frame has 2 timbers together for extra strength (effective 94mm x 100mm when screwed together).  The inside joists suspended by joist hangers to securely hold them above the ground.

The second picture gives a better view of the existing shed, to be incorporated, have a new door cut in the front, and re-clad to blend in seamlessly with the new room.

No comments: